Now that I've got almost everything done in pre-production, I can start to schedule everything else that I will need to do in order to get my film opening completed.
Thursday 5th Feb -- Sunday 8th Feb
-- Costume Design - Use the Sims to create 'dummy' costumes.
-- Transition Test with own footage.
-- Find Locations that I need for all shots
Monday 9th Feb - Sunday 15th Feb
-- Continuity Exercise with HD Cameras
-- Film Shots 3 - 9
-- Location 1 for 3 (any suitable road)
-- Location 2 for 4 (corner road with a building with a sharp corner)
-- Location 3 for 5 (Inside a cafe/shop with a window looking out onto the road)
-- Location 4 for 6 (Inside a carpark with pillars and lighting, probably Grand Arcade Car Park in cambridge)
-- Location 5 for 7 - 10 (Eccles Close, Sawston)
Monday 16th Feb - Sunday 22nd Feb (Half Term)
-- Upload all filmed shots to computer and begin post production.
-- Film Shots 1 - 2 & 10 - End
-- Location 6 for 1 - 2 (Any suitable clear curb with a puddle and a clean road)
-- Location 7 for 11 (Inside looking at an old fashioned desk and a dark backdrop)
-- Location 8 for 12 - End (Same building as above, preferably, corridor with a coat rack, and a door at the end for the hanging)
-- Location 9 for the Last shot, to be green screened in. (Sawston Police station)
Friday 20th Feb - Friday 27th Feb
-- Upload all remaining shots to Computer and continue Post Production
-- Add all neccesary clips to After Effects
-- Use photoshop to create images for transitions
-- Use after effects to create transitions
-- Use after effects to create any other effects
-- Import all footage into Final Cut/Sony Vegas for editing
-- Edit
-- Render
-- Upload to Blog
-- Evaluation
-- Done